PCB Libraries Forum Homepage
Forum Home Forum Home > General > General Discussion
  New Posts New Posts RSS Feed - Naming Convention for PTH Headers
  FAQ FAQ  Forum Search   Events   Register Register  Login Login

Naming Convention for PTH Headers

 Post Reply Post Reply
Author
Message
vgalindo View Drop Down
New User
New User


Joined: 16 Mar 2015
Status: Offline
Points: 4
Post Options Post Options   Thanks (0) Thanks(0)   Quote vgalindo Quote  Post ReplyReply Direct Link To This Post Topic: Naming Convention for PTH Headers
    Posted: 30 Apr 2015 at 12:35am
I found duplicate names in PTH connectors using the Footprint Naming Convention.

The W identifier does not distinguish between circular or square Lead Shape, this create the same footprint name for different connectors; eg,
HDRV2W65P254_2X1_508X254H945 could have:
- a 0.65mm
square lead shape and hole of 1.12mm, or
- a 0.65mm circular lead shape and hole of 0.85mm

It would be interesting to specify the Lead Shape in W identifier?

Thank you very much.

Back to Top
Back to Top
Tom H View Drop Down
Admin Group
Admin Group
Avatar

Joined: 05 Jan 2012
Location: San Diego, CA
Status: Offline
Points: 5719
Post Options Post Options   Thanks (0) Thanks(0)   Quote Tom H Quote  Post ReplyReply Direct Link To This Post Posted: 30 Apr 2015 at 5:13am
Please start using the new IPC-7351C Footprint Naming Convention for all connectors.
 
MfrName_MfrPartNumber
 
Stay connected - follow us! X - LinkedIn
Back to Top
Mattylad View Drop Down
Advanced User
Advanced User
Avatar

Joined: 02 Jun 2012
Location: Lancashire UK
Status: Offline
Points: 152
Post Options Post Options   Thanks (0) Thanks(0)   Quote Mattylad Quote  Post ReplyReply Direct Link To This Post Posted: 15 May 2015 at 1:15pm
Has C been released\published yet?
Back to Top
Tom H View Drop Down
Admin Group
Admin Group
Avatar

Joined: 05 Jan 2012
Location: San Diego, CA
Status: Offline
Points: 5719
Post Options Post Options   Thanks (0) Thanks(0)   Quote Tom H Quote  Post ReplyReply Direct Link To This Post Posted: 15 May 2015 at 1:32pm
IPC-7351C is deep in development. Our next meeting is Monday morning.
 
It will go out to the entire 1-13 Land Pattern sub-committee next week for review and feedback.
 
It will go through final Executive Committee approval in September at SMTA in Rosemont, IL and then head out for 30-day ballot vote with the 1-13 Land Pattern sub-committee.
 
Then the new Guideline will go into type setting for first article proof and then in February 2016 production should begin.
 
The IPC-7351C Guideline is 90% written but the last 10% will take a couple months and the evaluation and editing / approval phase also takes a couple months. Voting could take 90 days if it doesn't pass on the 1st vote.
 
Stay connected - follow us! X - LinkedIn
Back to Top
 Post Reply Post Reply

Forum Jump Forum Permissions View Drop Down



This page was generated in 0.219 seconds.